1

The Original

Before picture, shingles are loaded on the roof top.

2

Tear Off

Tearing-off the existing shingles. When possible the old shingles are thrown right into our dump trucks, (no dumpsters or trailers) so as little debris as possible hits the ground.

3

Aluminum Drip Edge

Install new aluminum drip edge (seen in white) around the entire perimeter of the house.

4

Ice and Water Shield

Installing ice and water shield along the bottom edge (until it is at least 24 inches past the warm wall) and in the valleys.

5

#15 Felt Paper

Installing 15# felt paper over the remainder of the roof.

6

Closer Look

Closer look at drip edge, ice and water shield on bottom and in the valley with felt paper.

7

Shingles

Installing shingles. (Timberline 30 Fox Hollow Gray)

pipe flashing

Pipe Flashing

Installed new pipe flashing. (Flange)

9

Finished Front

10

Finished Back